Re: [Mpi-forum] MPI 3.0 Passed tickets
Hi all, Merged tickets for my chapters (Colls, Topology, RMA): Topology: #140 #258 #158 #162 #259 #299 Collectives: #140 #265 #312 RMA: #140 #270 #298 #308 all in approved/MPI-3.0 . I also added comments to all tickets that I merged. Author fields are not always set correctly, I suggest we re-discuss the purpose/usage of those fields. All the Best, Torsten On Tue, May 29, 2012 at 03:14:06PM +0900, William Gropp wrote:
For my chapter (groups and context): 140 is done 182 is done 207 is done 219 is done 254 is done (in most cases, other chapters also need to be modified before the ticket is complete). 287 probably belongs in the groups and context chapter, but there is no clean description of the change in the ticket, only the nearly 700 page modified draft standard (did we really read and vote on the entire 681 page document?). This is probably a good time to remind everyone that we need a clean description of the change; producing a PDF of the entire document doesn't provide a workable way to communicate the change to the Forum, as realistically, no one is going to read through all of those pages. Please provide the LaTeX diff and enough of the chapter(s) rendered as PDF to enable review, or clearly indicate the full scope (ranges of pages) of the change. William Gropp Director, Parallel Computing Institute Deputy Director for Research Institute for Advanced Computing Applications and Technologies Paul and Cynthia Saylor Professor of Computer Science University of Illinois Urbana-Champaign On May 29, 2012, at 2:49 PM, Richard Graham wrote:
Attached is the list of tickets that have passed all but the final 3.0 chapter vote, and have not yet been incorporated into the approved version � some were taken care of as this list was being created. I have included the ticket number, ticket owner, and the affected chapter.
Authors: Please send me an update on the affected chapters, AND work with each of the chapter authors to make sure the changes get moved into the approved section.
>>> As we discussed at the current meeting, THE GOAL IS TO GET ALL PASSED CHANGES INTO THE APPROVED REPOSITORY BY JUNE 15. << The goal is to let people start to read over the new version of the standard before the July meeting, so that we can get a draft out for comment 1-2 weeks after the July meeting, and allow for comments before the final vote in Sept. If you can�t make that date, please let me know ASAP, so we will find someone else who can do the work.
Thanks, Rich <MPI 3.0 tickets for inclusion.xlsx>_______________________________________________ mpi-forum mailing list [1][email protected] [2]http://lists.mpi-forum.org/mailman/listinfo.cgi/mpi-forum
References
Visible links 1. mailto:[email protected] 2. http://lists.mpi-forum.org/mailman/listinfo.cgi/mpi-forum
_______________________________________________ mpi-forum mailing list [email protected] http://lists.mpi-forum.org/mailman/listinfo.cgi/mpi-forum
-- ### qreharg rug ebs fv crryF ------------- http://www.unixer.de/ ----- Torsten Hoefler | Performance Modeling and Simulation Lead Blue Waters Directorate | University of Illinois (UIUC) 1205 W Clark Street | Urbana, IL, 61801 NCSA Building | +01 (217) 244-7736
participants (1)
-
Torsten Hoefler