Re: [allocations-admins] [LCRC Accounts] Project Allocation Request
Reminder: I haven’t seen any decisions on this one yet. Thanks! -- John Roberts Argonne National Laboratory CELS Systems [email protected] On 12/6/16, 10:51 PM, "[email protected] on behalf of [email protected]" <[email protected] on behalf of [email protected]> wrote: Hello, A change in allocation has been requested: Requester: ssom (Sibendu Som) Project: gm_gasexchange Title: Modeling Cyclic Variability in the GM TCC Engine Using LES Description: The project is divided into three parts: In the first part, large eddy simulation (LES) will be used to model 50 consecutive cycles of the fired GM transparent combustion chamber (TCC) engine with a base grid size of 0.5 mm. Adaptive mesh refinement will be employed to resolve the flame region with a 0.125 mm grid. The mean and variance of the predicted flow field and the in-cylinder pressures will be compared to the PIV measurements. In the second part of this study, the parallel cycle methodology will be extended to the fired TCC engine, which will enable fast throughput computation of the cyclic variability. In the previous year, this methodology was demonstrated for motored conditions. In the final part of this study, the parallel cycle methodology will be used to perform a parametric study on the influence of numerical parameters like minimum grid size, number of cycles, and spark energy deposition on the predicted cyclic variability. Current: undetermined amount Justification: Requested: 150000 A specific reason has been given: we ran more simulations than what we were expecting to run initially. These extra simulations have resulted in an additional paper with GM R&D for SAE WC 2017. This needs to be approved and the final allocation amount decided upon. Thank You, The LCRC Accounts System _______________________________________________ allocations-admins mailing list [email protected] https://lists.lcrc.anl.gov/mailman/listinfo/allocations-admins
participants (1)
-
Roberts, John E.