Re: [JLSE-Admins] Request: JLSE VLAN Availability in 240-4312
All, Have we made any progress on this project? Ben On Sep 2, 2014, at 5:57 PM, Linda Winkler <[email protected]> wrote:
On Sep 2, 2014, at 5:56 PM, "Allen, Benjamin S." <[email protected]> wrote:
Linda and Corby,
Has there been any progress on:
1. Getting a permanent solution to getting the fiber patched through to 4312 2. Having the building deal with the water leak
the roof leak has been resolved
3. Getting a new networking cabinet for the room
Thanks,
Ben
On Jul 1, 2014, at 9:31 AM, Linda Winkler <[email protected]> wrote:
4312 makes sense lw On Jul 1, 2014, at 9:24 AM, "Allen, Benjamin S." <[email protected]> wrote:
Works for me. Added Kaz to the list if he's available. Craig is on vacation.
Shall we meet at 4312 or a conference room?
Ben
From: "Schmitz, Corby B." <[email protected]> Sent: Jul 1, 2014 9:20 AM To: "Winkler, Linda" <[email protected]>;Allen, Benjamin S. Cc: "Milner, Ryan B." <[email protected]>;Stacey, Craig J.;Holohan, Edmund A., III;[email protected] Subject: RE: Request: JLSE VLAN Availability in 240-4312
I'm good.
-- corby
-----Original Message----- From: Linda Winkler [mailto:[email protected]] Sent: Tuesday, July 01, 2014 9:20 AM To: Allen, Benjamin S. Cc: Schmitz, Corby B.; Milner, Ryan B.; Stacey, Craig J.; Holohan, Edmund A., III; [email protected] Subject: Re: Request: JLSE VLAN Availability in 240-4312
2pm?
On Jul 1, 2014, at 8:23 AM, "Allen, Benjamin S." <[email protected]> wrote:
ALCF has its operations meeting at 10:30, how's sometime this afternoon for everyone? Note this isn't urgent so we can push it to a later date if needed.
Ben
From: Linda Winkler <[email protected]> Sent: Jul 1, 2014 8:19 AM To: Allen, Benjamin S. Cc: "Holohan, Edmund A., III" <[email protected]>;Milner, Ryan B.;Schmitz, Corby B.;Stacey, Craig J.;[email protected] Subject: Re: Request: JLSE VLAN Availability in 240-4312
Tues 10am? lw
On Jun 30, 2014, at 4:58 PM, "Allen, Benjamin S." <[email protected]> wrote:
Sounds good. Feel free to propose a place and time to meet.
Ben
On Jun 30, 2014, at 4:38 PM, Linda Winkler <[email protected]> wrote:
Let's review the requirements on Tues and develop a plan. It has been sometime since anyone paid attention to needs in that space. lw
On Jun 30, 2014, at 4:11 PM, "Allen, Benjamin S." <[email protected]> wrote:
Hello Everyone,
The east part of 240-4312, what was formally named Tinkerlab, has joined JLSE. We would like to put a number of machines housed in that room on a new private VLAN that is also accessible by ftsn1, ftsn2, ftlogin1, and ftlogin2. These servers are behind ALCF’s Donald.
It appears there’s a Juniper switch serving the room. There are also a number of small desktop switches in the tinkerlab area, which ideally we could replace with a single managed switch in a configuration that meets Kaz and others needs. It appears the existing uplink from the Juniper is a 10GbE port, and the second 10GbE port on the Juniper switch is used for the display wall machine.
As an aside I would also suggest we get a number of additional floor tiles cut with matching floor grommets, for each work area in the thinkerlab. Then all network cabling can be run under the floor to eliminate the current tripping hazards.
Please let me know what is required to make this work.
Thanks,
Ben
participants (1)
-
Allen, Benjamin S.